Construction Activities
Work will occur during daytime hours unless otherwise noted.
SR 134 to Magnolia Boulevard
Alameda Avenue: Construction of concrete bridge barriers.
Alameda Avenue Northbound and Southbound I-5 Ramps: Constructing drainage inlets.
Bridge Construction: Work on Sonora Avenue, Alameda Avenue and Western Avenue Bridges.
Magnolia Boulevard to Buena Vista Street
Buena Vista Bridge (Winona Bridge): Installation of falsework on southbound side. Work on lower part of bridge structure (forming soffit and stems) for southbound I-5 widening.
Buena Vista Railroad Bridge: Forming of abutment footings and abutments (supporting structures at the ends of the bridge span).
Buena Vista Ramps: Paving operation between the ramps.
Burbank Western Channel: Backfilling trench operations.
Empire Avenue: Pouring and forming footings for underpass and abutment walls. Retaining wall work.
Railroad Retaining Wall: Installation of precast wall panels between Hollywood Way and Burbank Boulevard.
Victory Place: Forming of abutments for the bridge and walls.
Old San Fernando Road Tunnel: Concrete crushing.
Closures and Detours
SR-134 to Magnolia Boulevard
+ Intermittent closures of the northbound I-5 Alameda Avenue off- and on-ramps from 7 a.m. to 3:30 p.m.
+ The Los Angeles River Bike Path between Riverside Drive and just south of the SR-134
overcrossing in the City of Los Angeles will be closed through spring 2016. A signed detour is posted that directs bike path users to Zoo Drive and Western Heritage Way. See map here.
Magnolia Boulevard to Buena Vista Street
+ Intermittent closure of the southbound I-5 Burbank Boulevard off-ramp for equipment loading (night work).